Pitman (2-2-3) Schedule Calendar & Generator
Four crews on fixed 12-hour shifts. Each crew works 2 on, 2 off, 3 on, 2 off, 2 on, 3 off over a 14-day cycle, so every crew gets every other weekend off.
Also called: 2-2-3 schedule, 2-3-2 schedule, 3-2-2-3 schedule, every other weekend off.
At a glance
- Shift length
- 12 h
- Avg hours / week
- 42
- Weekends off / year
- 26
- Longest stretch on
- 3 shifts
- Longest break
- 3 days
- Cycle length
- 14 days
Pitman schedule generator
Keep it synced on your phone
The .ics download is a one-time copy. Calendar sync gives you a live calendar link for Google Calendar, Apple Calendar or Outlook that rolls forward on its own, and you can change crew or schedule any time without re-importing.
Checkout canceled. You haven't been charged.
Syncs the schedule shown above.
Secure checkout by Stripe. Cancel any time. Terms
How the Pitman schedule works
The Pitman schedule is one of the most common 12-hour rotations for 24/7 operations. Four crews split days and nights, and each crew works a 2-2-3 pattern that repeats every two weeks.
Over 14 days a crew works 2 days, has 2 off, works 3, has 2 off, works 2, then has 3 off. The second week mirrors the first, so the long 3-day weekend lands on alternating weekends.
Two crews cover days and two cover nights. In this version crews stay on their shift (fixed days or fixed nights), which is the usual meaning of “Pitman”. The rotating version, where crews switch between days and nights, is usually called the Panama schedule.
Pay periods line up neatly: in a two-week period every crew works exactly 7 shifts, or 84 hours, so overtime is easy to predict.
Pitman (2-2-3) Schedule crew rotation, day by day
Each row is one crew over one full 14-day cycle. Read down a column to see who is working on that day.
- D = Day (07:00–19:00)
- N = Night (19:00–07:00)
- – = Off
| Day | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Crew A | D | D | – | – | D | D | D | – | – | D | D | – | – | – |
| Crew B | – | – | D | D | – | – | – | D | D | – | – | D | D | D |
| Crew C | N | N | – | – | N | N | N | – | – | N | N | – | – | – |
| Crew D | – | – | N | N | – | – | – | N | N | – | – | N | N | N |
Who uses it
- Manufacturing plants
- Police and security
- Hospitals and 911 centers
- Anyone who wants every other weekend off
Trade-offs
- 12-hour days are tiring, especially 3 in a row.
- Fixed night crews never rotate to days unless the employer swaps crews periodically.
Pitman (2-2-3) Schedule FAQ
How many hours a week is a Pitman (2-2-3) schedule?
42 hours a week on average. That is about 183 12-hour shifts a year, though individual weeks vary.
How many weekends off do you get on a Pitman (2-2-3) schedule?
About 26 full weekends (Saturday and Sunday) off a year per crew. Use the generator to see exactly which ones for your crew.
How long is the Pitman (2-2-3) rotation?
The cycle repeats every 14 days. The longest run of shifts is 3 in a row and the longest break is 3 days off in a row.
Is the Pitman schedule the same as a 2-2-3 schedule?
Yes. “2-2-3” and “2-3-2” describe the same 14-day rotation of 2 on, 2 off, 3 on, 2 off, 2 on, 3 off. Pitman usually means crews stay on fixed days or fixed nights.
What is the difference between Pitman and Panama?
They share the 2-2-3 rhythm. On Pitman each crew keeps the same shift; on Panama each crew works the 14-day cycle on days and then again on nights, making a 28-day cycle.
Can I print a Pitman (2-2-3) calendar or add it to my phone?
Yes. Pick your crew and cycle start date in the generator, then use “Print calendar” for a 12-month printable calendar or “Download .ics” to import your shifts into Google Calendar, Apple Calendar or Outlook. It's free and needs no account.
Related schedules
- Panama ScheduleThe 2-2-3 rotation with crews rotating between days and nights.
- DuPont Schedule12-hour rotating shifts on a 4-week cycle with a 7-day break.
- 4 On 4 Off ScheduleFour 12-hour shifts, then four days off, on an 8-day cycle.
- 2 On 2 Off ScheduleTwo 12-hour shifts, then two days off, on a 4-day cycle.